Operating as the Director responsible for overall delivery of the scheme
Sector: Food & Manufacturing
Client: Muller Dairy
Role: Operating as the Director responsible for overall delivery of the scheme.
The scheme was a 100,000 ft² new build extension to the existing facility. Works were meticulously planned over two phases to provide successful access for the Client’s MHE contractors.
All works were delivered in line with the client’s stringent timescale and facilitated the erection of a 30 meter cladrack high bay unit to be built in conjunction with the main build.