Muller Dairy Case Study

Operating as the Director responsible for overall delivery of the scheme

Construction Consultant Case Study

Sector: Food & Manufacturing

Client: Muller Dairy

Role: Operating as the Director responsible for overall delivery of the scheme.

Project Summary

The scheme was a 100,000 ft² new build extension to the existing facility.  Works were meticulously planned over two phases to provide successful access for the Client’s MHE contractors.  

All works were delivered in line with the client’s stringent timescale and facilitated the erection of a 30 meter cladrack high bay unit to be built in conjunction with the main build.